Showing posts with label First Floor. Show all posts
Showing posts with label First Floor. Show all posts

Thursday, September 17, 2009

First floor screed





Not a lot to see - but the first floor screed was poured today and power floated ( if thats the correct term) to get it level. Good to see some activity again on site. Hopefully blocks will start again next week.

Friday, September 4, 2009

Concrete first floor installation


First truck wasn't able to make its way down due to the narrow roads. Thankfully the smaller truck and the crane were able to!!
Barrier for air tightness - due to new regs out this year.





Kitchen ceiling.